Bond Project Scope
Repair and update district facilities
- Replace membrane roof
- Address stormwater runoff
- Install hydronic water piping to serve new HVAC distribution system (continue to utilize the district’s biomass central plant built in 2008)
- Abate asbestos
- Install energy efficient windows
- Remove and replace damaged sidewalks
- Remove and replace damaged asphalt
Improve accessibility
- Install a ramp in the junior high and a lift from the gym foyer to the gym floor level
- Install elevators in the junior high and senior high
- Remodel restrooms to ADA standards
Improve safety and security
- Provide secure entry vestibules in the junior high and senior high
- Install a key card system to control access to buildings
- Add security cameras
- Add sensors on key doors
Modernize student spaces
- Remodel and update science classrooms
- Remodel the junior high locker rooms