Bond Project Scope

Repair and update district facilities

  • Replace membrane roof
  • Address stormwater runoff
  • Install hydronic water piping to serve new HVAC distribution system (continue to utilize the district’s biomass central plant built in 2008)
  • Abate asbestos
  • Install energy efficient windows
  • Remove and replace damaged sidewalks
  • Remove and replace damaged asphalt

Improve accessibility

  • Install a ramp in the junior high and a lift from the gym foyer to the gym floor level
  • Install elevators in the junior high and senior high
  • Remodel restrooms to ADA standards

Improve safety and security

  • Provide secure entry vestibules in the junior high and senior high
  • Install a key card system to control access to buildings
  • Add security cameras
  • Add sensors on key doors

Modernize student spaces

  • Remodel and update science classrooms
  • Remodel the junior high locker rooms